






Hotspots: Admin Pages | Turn-in Site |
Current Links: Case Final Project Summer 2007
M5_OTIB
Description
Due to the success of the design, M5 was LITERALLY taking the GameEngine and turning it on. After 10 minutes of work, M5 was complete for the minimum requirements.
More explanation as to how the proceses were handled can be found here: The Multi-threaded OTIB OS Simulation
M5.zip
Link to this Page
- Team OTIB OS last edited on 5 December 2004 at 10:01 pm by helsinki.cc.gatech.edu