






Hotspots: Admin Pages | Turn-in Site |
Current Links: Case Final Project Summer 2007
M4_OTIB
Description
This phase involved writing all the code. The only notable exception was the GameEngine, which was left "off" and would be turned on for M5, the Simulation Milestone.
The notable changes in design are found uniquely in the View portion of the engine.
M4.zip
Link to this Page
- Team OTIB OS last edited on 5 December 2004 at 10:01 pm by helsinki.cc.gatech.edu