Hotspots: Admin Pages | Turn-in Site |
Current Links: Case Final Project Summer 2007
Questions on Summer 2003 M3 Milestone
Got Questions?
Yes'm
How do we go about setting up a design round table meeting?
Sign up on the "Design Roundtable - Summer 2003" page found in the Project Links section at the top of the page. Barbara Ericson
Do we need to put our GUI classes into our UML and also in our CRC cards?
The CRC cards are the analysis of the domain and don't include GUI items. Actually you might have created a card for it but then realized it was GUI and not continued with it. The UML Class Diagram is of the design for your solution and should have GUI classes in it. Barbara Ericson
How do we go about getting the "5% extra credit for a team meeting with your TA to discuss and review the design."? I am assuming that we meet with him/her before we turnin M3? How do we know who are TA is? Have TA's been assigned to the groups yet? Thanks, Mandy Zielonka
No, wait until M3 is graded. That way your TA can tell you what you are doing wrong or right. After you get a grade on M3 go as a team to meet with the TA during office hours or send him/her a message to schedule a meeting. Barbara Ericson
For the description for all classes, responsibilities of each team member, the internal group timeline, and the joint document, are those supposed to be readme files that will be turned in via coweb and in class on Thur? And we only need one copy of everything for the whole team, right? Thanks a lot. ~Sabina Karkin
You can turn in items on the coweb but also provide a paper copy unless your TA has said he/she doesn't need it. Yes, you only need one copy of the documents for the team. Barbara Ericson
For some reason, the RoundTable page will not allow me to add "The Grads" to it. It times out and won't save the edit. I'm not sure if others may be having the same issue since I don't see anyone on the page yet.
Yeah, my group is having the same problem, we are unable to sign up also. Mandy Zielonka
I fixed it. I put "The Grads" and "Captain Kirk and the Crew" on it. Barbara Ericson
For "RESPONSIBILITIES" and "TIMELINE", are we supposed to include what we have done for M-3 or are we supposed to include what we going to do for M-4 and M-5 ?
Aldrian Harjati
For M4 and M5 Barbara Ericson
For the UML diagrams, can we just turn in a link to a web page? Our group used Rational Rose's web publisher.
Royce Cho
Check with your TA. Some don't mind. If you don't get an okay turn in hardcopy too. Barbara Ericson
Can we devide the responsibilities based on the classes ?
Chris Widjaja
Yes, if you think that is a fair division Barbara Ericson