Monkeys with Vertigo 3

This was the milestone that proved to be the most important one! Once we had a plan – documented one – it felt like the work we were doing finally got a direction and it seemed like all the work we did (seperately) was easier to put together once we had the pieces coded.
Our CRCs and the UML diagram is shown below. Note the detail we went in when spelling out all the methods we needed. It proved to be a good design. We did end up modifying it marginally as we started coding all the features, but the overall structure held up very good!

Monkeys with Vertigo UML diagram

Link to this Page